Get a Free Quote

Quality & Certifications

ISO 9001 certified processes, systematic inspection protocols, and a relentless focus on dimensional accuracy — because every micron matters in injection mold manufacturing.

Quality Assurance at a Glance

  • ISO 9001 certified quality management system — every process from design through shipment governed by documented procedures and acceptance criteria.
  • In-house T1 sampling and dimensional inspection using calibrated CMM, digital height gauges, micrometers, and surface profilometers — full reports shared with every mold delivery.
  • PPAP documentation support (typically Level 3) including PFMEA, control plans, MSA, and process capability studies for automotive supply chain requirements.
  • SPC-driven production monitoring with real-time control charts for critical dimensions — ensuring every molded part, not just the measured ones, stays within specification.
  • Four-stage quality gates: incoming material inspection → in-process dimensional checks → tool tryout & T1 verification → final audit before crating and shipment.
Quality inspection and CMM measurement of injection mold

Quality Is Built In, Not Inspected In

At Gege Mould, quality management is not a final checklist — it is embedded into every stage of our process, from the moment we receive your CAD data to the day your mold ships.

We operate under an ISO 9001 certified quality management system, following the guiding principle of "meticulous craftsmanship and complete customer satisfaction." Our quality team is empowered to stop any process that does not meet specification — because we know that a single deviation can cascade into production problems on your factory floor.

From incoming raw material inspection through in-process checks, tool tryouts, and final dimensional verification, every mold leaves our facility with a complete inspection record and T1 sample report.

Certifications & Standards

Our quality system is built around internationally recognized standards that our customers trust.

ISO 9001 Certified

ISO 9001 — Quality Management Systems

Our core quality management certification. Every process — design, procurement, manufacturing, inspection, and customer communication — is governed by documented procedures with clear acceptance criteria and continuous improvement mechanisms. Regular internal audits and management reviews ensure the system remains effective and evolves with our business.

PPAP

PPAP — Production Part Approval Process

For automotive customers, we support PPAP submissions at the required level (typically Level 3), including dimensional results, material certifications, process flow documentation, PFMEA, control plans, measurement system analysis (MSA), and initial process capability studies. Our team is experienced with the documentation requirements of global OEM supply chains.

SPC

Statistical Process Control

During production molding runs, we apply SPC methodology to monitor critical dimensions and process parameters in real time. Control charts track Cp and Cpk values, giving both our team and our customers confidence that every part produced falls within specification — not just the ones that happen to get measured.

MSA

Measurement Systems Analysis & FAI

First Article Inspection (FAI) reports are generated for every new mold using calibrated CMM equipment, height gauges, and precision measurement tools. We perform gauge R&R studies to ensure our measurement systems are capable of detecting variation well within your tolerance band.

How We Control Quality

A systematic approach that catches issues early — when they are cheapest and easiest to fix.

1

Incoming Material Inspection

Every batch of mold steel, hot-runner component, and raw material is inspected against mill certificates and our own acceptance criteria before entering production.

2

In-Process Inspection

Dimensional checks at key machining stages — after roughing, before and after heat treatment, and at final fitting. Issues are corrected immediately, not passed downstream.

3

Tool Tryout & T1 Sampling

Every mold is trialed in-house with production-grade material. T1 samples are dimensionally inspected and a complete report is shared with the customer for review and sign-off.

4

Final Audit & Shipment

Before crating, each mold undergoes a final comprehensive inspection. All documentation is compiled — inspection reports, material certs, maintenance instructions, and spare parts lists.

Inspection & Measurement Equipment

Precision measurement tools that ensure every mold dimension meets your engineering specification.

CMM

Coordinate Measuring Machines for full 3D dimensional verification of complex mold geometries and molded samples against CAD nominal data.

Height Gauges & Calipers

Digital height gauges, micrometers, and vernier calipers — all calibrated to traceable standards for critical dimension checks.

Surface Roughness

Surface profilometers to verify mold cavity finishes match specified SPI/VDI standards, from mirror polish to textured.

Hardness Testers

Rockwell and Brinell hardness testing to confirm mold steels and heat-treated components meet material specifications.

Quality inspection and precision measurement equipment at the Gege Mould manufacturing facility — calibrated instruments for dimensional verification of injection mold components
Quality inspection and precision measurement at the Gege Mould facility. Every injection mold component undergoes dimensional verification using calibrated CMM equipment, digital height gauges, and surface profilometers — all traceable to international standards.
Gege Mould quality assurance and manufacturing workshop — organized production environment supporting ISO 9001 certified processes
Manufacturing workspace at the Gege Mould quality-controlled facility. The ISO 9001 certified production environment is organized for systematic workflow, traceability, and consistent quality output — from incoming material inspection through final mold audit and shipment.
Coordinate Measuring Machine (CMM) dimensional inspection lab at Gege Mould — precision measurement and quality verification of injection mold components
Coordinate Measuring Machine (CMM) inspection lab at Gege Mould. Every mold cavity, core, and critical insert undergoes dimensional verification against CAD nominal specifications using calibrated CMM equipment. Measurement reports are traceable to international standards and included with every mold delivery — supporting full PPAP Level 3 documentation packages for automotive supply chain compliance.
Precision surface grinding workstation at Gege Mould — achieving flatness and surface finish tolerances for injection mold components
Precision surface grinding at the Gege Mould quality-controlled manufacturing facility. Mold base plates, insert backing surfaces, and parting line faces are ground to tight flatness and surface finish tolerances — essential for maintaining consistent cavity pressure distribution, preventing flash, and ensuring reliable mold performance across thousands of production cycles.

Quality You Can Measure, Reliability You Can Count On

Talk to our quality team about your inspection and documentation requirements for your next mold program.

Discuss Your Requirements